Snow-melting systems use constant-wattage twin-conductor or self-regulating PTC cable at an overall 150–350 W/m². Sheltered residential driveways run 200–250 W/m² for a 60–90 minute clear, exposed commercial sites 250–300, and ramps, bridges and decks 300–350. Systems run on 230 V or 400 V three-phase with XLPE insulation, tinned-copper braid and an alkali-resistant outer jacket, IP67 joints and at least 2 m of cold lead. A slab sensor measures both temperature and moisture 30–50 mm deep, cable spacing is 100–200 mm with a 15–20% margin, and 40–50 mm of cover is poured. Reference pricing is US$18–60 per square metre.

01

Snow melting buying and technical guides

02

How output changes by surface

01Sheltered residential driveways

At 200–250 W/m² a protected driveway clears in 60–90 minutes, with the lower figure used where wind and exposure are limited.

02Exposed commercial sites

Loading areas and open lanes run 250–300 W/m² to handle wind-driven snow and continuous use, often on 400 V three-phase.

03Ramps, bridges and decks

The 300–350 W/m² band covers sloped and elevated surfaces that refreeze quickly, with closer spacing and a 15–20% margin.

03

Specification at a glance

ParameterStandard rangeWhat it means on site
Overall output150–350 W/m²Two cable families
Residential200–250 W/m²60–90 min clear
Commercial250–300 W/m²Exposed lanes
Ramps and decks300–350 W/m²Refreeze risk
Voltage230 V / 400 V 3phIP67 joints, 2 m cold lead
Spacing100–200 mm15–20% margin
SensorTemp + moisture, 30–50 mm deep300 mm from cable
Reference priceUS$18–60/m²Cable 18–40, mat 30–60
04

How to specify it in five steps

01

Classify the surface. Sheltered, exposed or ramp/bridge and select the output band from that.

02

Calculate the load. Multiply area by W/m²; a 100 m² commercial lane at 250 W/m² is a 25 kW system.

03

Set spacing and margin. Use 100–200 mm spacing and add 15–20% for edges and sensors.

04

Position the sensor. Place the combined temp/moisture slab sensor 30–50 mm deep and at least 300 mm from cable.

05

Pour and test. Cover with 40–50 mm, test circuits before and after the pour, and verify IP67 joints.

05

Where it is the wrong choice

Undersizing an exposed or sloped surface is the most common error: it leaves a half-cleared lane that refreezes. The system is also wasted on a manually operated switch left on after the storm, which is why an automatic slab sensor is recommended rather than a timer alone.

06

Questions we get asked

Cable or mat?

Loose cable suits large or irregular pours and runs US$18–40/m²; mats install faster on standard shapes at US$30–60/m².

How does the sensor work?

A slab sensor reads both temperature and moisture and switches the system only when snow is present, cutting wasted run time.

What spacing is used?

Between 100 and 200 mm depending on output, with a 15–20% margin at edges and cold areas.

How much energy does a season use?

A 100 m² commercial lane at 250 W/m² with 300–500 full-load hours uses roughly 7,500–12,500 kWh.

Why an alkali-resistant jacket?

Fresh concrete is alkaline and will attack a standard jacket, so the outer layer is specified for direct burial.

Next step

Send the site plan, surface type and exposure. We return output, spacing, load, sensor position and a bill of materials. Roof and gutter work follows the same cable families; indoor floors use the heating mat or cable hubs.

Last reviewed November 2026. Specifications reflect the current factory datasheet; confirm values before ordering.