01Sheltered residential driveways
At 200–250 W/m² a protected driveway clears in 60–90 minutes, with the lower figure used where wind and exposure are limited.
How outdoor snow-melting cable is designed — output by surface, voltage, sensors and the spacing that clears a driveway on schedule.
Snow-melting systems use constant-wattage twin-conductor or self-regulating PTC cable at an overall 150–350 W/m². Sheltered residential driveways run 200–250 W/m² for a 60–90 minute clear, exposed commercial sites 250–300, and ramps, bridges and decks 300–350. Systems run on 230 V or 400 V three-phase with XLPE insulation, tinned-copper braid and an alkali-resistant outer jacket, IP67 joints and at least 2 m of cold lead. A slab sensor measures both temperature and moisture 30–50 mm deep, cable spacing is 100–200 mm with a 15–20% margin, and 40–50 mm of cover is poured. Reference pricing is US$18–60 per square metre.

System Design Guide
Coverage, load and controls for an outdoor build.
Read the guide →
Driveway Cable
A Nordic retrofit case and buying guide.
Read the guide →
Sensor Control
Moisture and temperature sensing and timing.
Read the guide →
Power Density Choice
Choosing output by surface and exposure.
Read the guide →
Roof and Gutter Deicing
How heat cable stops ice dams.
Read the guide →
Heated Driveway Mat
Jacket material and sizing before wattage.
Read the guide →
Full vs Partial Coverage
Load, cost and the tire-track choice.
Read the guide →
Snow Melting Electrical Load and Breaker Sizing: Circuits, Headroom and Three-Phase
Working out snow-melting load, current, breaker and contactor before the cable goes in.
Read the guide →At 200–250 W/m² a protected driveway clears in 60–90 minutes, with the lower figure used where wind and exposure are limited.
Loading areas and open lanes run 250–300 W/m² to handle wind-driven snow and continuous use, often on 400 V three-phase.
The 300–350 W/m² band covers sloped and elevated surfaces that refreeze quickly, with closer spacing and a 15–20% margin.
| Parameter | Standard range | What it means on site |
|---|---|---|
| Overall output | 150–350 W/m² | Two cable families |
| Residential | 200–250 W/m² | 60–90 min clear |
| Commercial | 250–300 W/m² | Exposed lanes |
| Ramps and decks | 300–350 W/m² | Refreeze risk |
| Voltage | 230 V / 400 V 3ph | IP67 joints, 2 m cold lead |
| Spacing | 100–200 mm | 15–20% margin |
| Sensor | Temp + moisture, 30–50 mm deep | 300 mm from cable |
| Reference price | US$18–60/m² | Cable 18–40, mat 30–60 |
Classify the surface. Sheltered, exposed or ramp/bridge and select the output band from that.
Calculate the load. Multiply area by W/m²; a 100 m² commercial lane at 250 W/m² is a 25 kW system.
Set spacing and margin. Use 100–200 mm spacing and add 15–20% for edges and sensors.
Position the sensor. Place the combined temp/moisture slab sensor 30–50 mm deep and at least 300 mm from cable.
Pour and test. Cover with 40–50 mm, test circuits before and after the pour, and verify IP67 joints.
Undersizing an exposed or sloped surface is the most common error: it leaves a half-cleared lane that refreezes. The system is also wasted on a manually operated switch left on after the storm, which is why an automatic slab sensor is recommended rather than a timer alone.
Send the site plan, surface type and exposure. We return output, spacing, load, sensor position and a bill of materials. Roof and gutter work follows the same cable families; indoor floors use the heating mat or cable hubs.