Get a Quote

Heating Cable Applications & Buying Guides

How resistance heating cable is selected and installed — output per metre, conductor build, bend radius and the tests that decide service life.

  • 10–30 W/m
  • IPX8
  • double-insulated
  • 15–25 years
Twin conductor heating cable on a reel
SunAura | Qingdao

Heating cable is an alloy-resistance element, optionally built with a PTC core, supplied as a double-conductor single cold-tail cable that is double-insulated and shielded. Standard twin cable runs at a selectable 10–30 W/m, alongside PTC (16/30/45 W/m) and silicone (25/40/50 W/m, working from -60 to +200 °C) families. It goes under floors, on pipes and tanks, and into roof and road snow-melting builds. The guides below cover the geometry and electrical tests that decide whether a cable lasts its rated 15–25 years. Full dimensions are on the heating cable product page.

01

Heating cable buying and technical guides

02

Where each cable family fits

01Standard twin underfloor cable

The double-conductor single cold-tail build at 10–30 W/m is the default for embedded floors: one cold lead simplifies connection, and full shielding plus double insulation meet IPX8.

02PTC cable for added safety

The PTC family at 16/30/45 W/m reduces output as it warms, which limits surface temperature in close-spacing or risk areas and lowers the chance of overheating.

03Silicone cable for extremes

Silicone builds at 25/40/50 W/m work from -60 to +200 °C, suiting drain lines, high-temperature process work and very cold sites where PVC would stiffen.

03

Specification at a glance

ParameterStandard rangeWhat it means on site
Twin output10–30 W/m selectableEmbedded floors
PTC output16 / 30 / 45 W/mSelf-limiting behaviour
Silicone output25 / 40 / 50 W/m-60 to +200 °C
Voltage110 V / 220–230 V220–240 build available
ProtectionIPX8, double-insulated, shieldedWet and buried use
ConductorDouble conductor, single cold tailOne connection point
Service life15–25 yearsDependent on bend and test
CertificationCE, RoHS, ISO 9001EU procurement
04

How to specify it in five steps

01

Pick the family. Standard twin, PTC or silicone according to spacing, temperature and safety needs.

02

Set output and spacing. Choose W/m from the floor load and convert to cable spacing, respecting the minimum bend radius.

03

Plan the cold lead. Route the single cold tail back to the junction box before fixing the cable to the mesh.

04

Test before and after. Record insulation resistance and continuity before screed, after laying, and again after the floor is covered.

05

Terminate correctly. Use the specified factory or crimped joint; never leave a cold-lead joint buried without testing.

05

Where it is the wrong choice

Cable fails early when it is bent below the minimum radius, crossed over itself, or buried without an insulation test. It is also the wrong choice where the floor build-up cannot absorb the cable diameter, or where a self-adhesive mat would cut installation time on a standard rectangular room.

06

Questions we get asked

What does IPX8 mean here?

The cable is rated for continuous immersion, which is what an embedded wet floor amounts to, backed by double insulation and a shield.

Can I shorten the cable?

No. A fixed-resistance cable is rated as a complete loop; cutting it changes resistance and output. The correct length is selected from the area calculation.

When is PTC worth specifying?

Where close spacing or a risk of overheating exists, because the PTC core lowers output as temperature rises. Standard rooms use the cheaper twin cable.

How is the cold lead joint protected?

By a factory-sealed or properly crimped and insulated joint that is tested before burial. Cold joints are the most common failure point.

What temperature can silicone cable take?

A working range of -60 to +200 °C, which is why it is used for drain lines and high-temperature process heating.

Next step

Send the floor area, build-up and design load. We return cable length, spacing, circuit load and the test schedule before installation. For pipe and freeze-protection builds, see the heat trace hub; outdoor snow work is on the snow melting cable hub.

Last reviewed November 2026. Specifications reflect the current factory datasheet; confirm values before ordering.